Takeoff Checklist: Get Your Drainage Takeoff Right the First Time

Most drainage takeoff problems are not mysteries. They are missed details: the wrong top, the wrong alloy, a no-hub outlet that was never selected, a carrier rating that was assumed, or a clamp that never made it onto the purchase order. A careful takeoff is still the cheapest way to get a drainage takeoff right the first time. This checklist is written for the way commercial contractors, engineers, and wholesalers request a quote from Kingsway Marketing LLC.

Use it against the drawings and the specification, then against the product page and the manufacturer spec sheet. Kingsway Marketing LLC represents Kusel stainless steel drainage and Wade specification drainage. The two catalogs do not substitute for each other. The checklist below keeps them from getting mixed on the same line item.

Before you start the takeoff

Gather the floor plans, roof plan, restroom and kitchen details, the drainage specification, and any fixture schedule that names carriers or receptors. Highlight every drain, sink, trough, trench, cleanout, roof drain, nozzle, trap, and carrier. Count openings, not just typical details. A typical 1100-A on a detail sheet may appear a dozen times, and those openings may not all share the same outlet size or top finish.

Decide which catalog each opening belongs to. If the specification names a Wade series, stay in the Wade collections. If it names a Kusel KE, Classic trench, or stainless floor sink, stay in the Kusel collections. When a project has both, take them off as two lists. That single habit prevents most cross-catalog substitutions.

The drain and receptor checklist

For each floor drain, floor sink, hub drain, trench, or trough, record the following before you add it to your takeoff list:

  • Type and location, including room name and drawing number.
  • Specified series or model, such as a Wade 1100 or 1310, a Kusel KE or KE-S, a KEM drain, or a Classic floor sink or trench drain.
  • Top style: round, square, extended-rim, open grate, solid grate, or channel grate.
  • Load class or duty, and any heel-resistant or accessibility grate notes.
  • Material and finish: cast iron body and top finish on Wade; 304 or 316L on Kusel.
  • Outlet type and size. On Wade products offered here, use no-hub where a connection type applies. On Kusel sinks and troughs, record Schedule 40 or Schedule 10 and the outlet size.
  • Accessories actually shown: primer, sediment bucket, basket, strainer, flashing clamp, or side outlet.
  • Quantity, plus any spares the specification requires.

If two openings share a series but not a top or an outlet, they are two line items. Do not average them into one configured product.

Roof, carrier, cleanout, and trap lines

Roof drainage needs its own pass. For each primary drain, confirm a Wade 3000 or the specified model, the no-hub outlet and dome, and whether the detail requires the WP3000-53 underdeck clamp. For each wall discharge, confirm the 3940-NH nozzle size and material. Clamps and nozzles are easy to omit because they are small on the drawing and expensive to add after the roof is in progress.

Carriers need a fixture-by-fixture pass. List each water closet, lavatory, and urinal, then match it to the specified carrier: 311, 311HD, 311XH, or 311XB for closets, 520 for concealed-arm lavatories, and 401 for urinals. Record the load rating, handing, and connection. A restroom with six closets is not automatically six identical carriers if the piping handing changes down the row.

Cleanouts and traps close the list. Note whether a cleanout is a Wade 6000 or 8000 or a Kusel stainless cleanout, including top finish and outlet. For Kusel P-traps, record alloy and schedule so they match the drain or sink they serve. Add accessories and fittings only when they are specified or required to complete an assembly you are already ordering.

Before you request a quote

Walk the list one more time against the product pages. Check that each Wade variant SKU is the complete specified part number, including outlet and finish codes. Check that each Kusel item has the right grate, accessory, alloy, and outlet. Confirm quantities against the drawings, not against memory. Then open the spec sheet for any line you are not certain about. The illustration on the product page is not a substitute for the dimensions on the sheet.

If you are buying as a wholesaler for a job or a restock, the same list still applies. A fast quote that has to be unpicked later is not fast. If a configuration, a handing, or a quoted option is unclear, stop and ask. It is cheaper than a second shipment.

Keep a short exception list as you go: openings that do not match a standard configuration, options that have to be quoted, or details that conflict with the specification. Send that list with the quote request instead of silently picking a nearby product. A documented exception is easier to resolve than a wrong item on the dock. If you are working from a revision cloud or a late addendum, re-check only the affected openings, then update quantities so an old count does not survive into the purchase order.

For background on the decisions inside the checklist, see our guides on choosing a commercial floor drain, stainless steel versus cast iron, roof drains and downspout nozzles, and carrier selection. When you want a second set of eyes on a takeoff, contact us or request a quote. Get it right the first time.